Analyzing the data indicates planificacion.gob.ec passed 2 availability tests within the 91 day duration from August 22, 2024. The latest uptime on November 19, 2024, resulted in a code 200, indicating that planificacion.gob.ec was operational in 2 instances across all tests. Checks that were done as of November 22, 2024, show that planificacion.gob.ec was never unavailable. Based on all of the replies that have been received, as of November 22, 2024, there have not been any recorded responses with an error status. Planificacion.gob.ec's November 19, 2024, response time of 2.655 seconds differed from its 3.178 seconds average response time.